|
192
Airport Rocket 
Service
increase
-
Service
will be increased, between approximately 12:30 and 7:30 p.m., every day, to
reduce crowding. The service will be improved from every 45 min to every 22
min 30 s. Existing trip times will not change.
New trips
from Kipling Station at: 12:47, 1:33, 2:17, 3:03, 3:47, 4:33, 5:17, 6:03, 6:47,
7:33 p.m.
New trips
from Terminal 3 at: 1:03, 1:49, 2:33, 3:19, 4:03, 4:49, 5:33, 6:19, 7:03, 7:49
p.m.
Trips
depart from Terminal 2 five minutes after Terminal 3.
7 Bathurst 
Service
increase
11
Bayview
and 28 Davisville 
Service
increase
-
Service
will be increased during the morning peak period from Monday to Friday, to
reduce crowding. The service on each of the 11 Bayview and 28
Davisville
routes will be improved from every 14 min to every 12 min 30 s. The combined
service on Davisville Avenue will be improved from every 7 min to every 6
min 15 s.
17 Birchmount
Service
reduction
49 Bloor
West 
Trip
time change
506/306
Carlton
Track
reconstruction
-
A
project to rebuild the track at five car stops on Gerrard Street and Main
Street will require that streetcars on the 506/306 Carlton routes be
replaced with buses on Saturdays and Sundays. Buses on the 506 Carlton route
will operate over the regular route between Main Street Station and High
Park, and will then operate via Parkside Drive to turn around at Keele
Station. There will be no change to the routing of the 306 Carlton overnight
service, which operates to Dundas West Station. Full streetcar service will
resume by September 8.
Routing
details
506
Carlton westbound: Over the regular routing from Main Street Station,
west on Howard Park Avenue, north on Parkside Drive to Keele Station.
506
Carlton eastbound: From Keele Station, south on Parkside Drive, east on
Howard Park Avenue, over the regular route to Main Street Station.
At stops
with passenger islands, buses will serve the islands; at all other
stops, buses will serve stops at the curb.
Destination
sign
506 HIGH
PARK / and KEELE STN
20 Cliffside

Service
reduction
87 Cosburn

Service
increase
42
Cummer 
Service
increase
108
Downsview 
Service
increase
29
Dufferin 
Service
increase
-
Service
will be increased during the daytime on Saturdays, Sundays and holidays, to
reduce crowding. The service will be improved from every 4 min 15 s to every
3 min 45 s on Saturdays, and from every 4 min 45 s to every 4 min on Sundays
and holidays.
Temporary
service change - City of Toronto road reconstruction
-
Service
will be revised as a result of the City of Toronto project to reconstruct
Dufferin Street from Bloor to Dupont streets. The road will remain open, but
will be restricted to one lane in each direction. This project will begin in
September, and will last through to the fall. To reduce the effects of
traffic delays, additional time will be added to the schedules during the
peak periods from Monday to Friday, the midday from Monday to Friday, and
the daytime on Saturday, Sunday and holidays.
32
Eglinton West
Trip
time changes
39
Finch East 
Service
increase
-
Service
will be increased during the early evening from Monday to Friday between
6:50 and 8:00 p.m., to reduce crowding. The service will be improved from
every 5 min to every 4 min. Service will be increased during the late
evening from Monday to Friday between 10:00 and 11:00 p.m., to reduce
crowding. The service will be improved from every 9 min to every 8 min.
Service will be increased during the daytime on Saturdays, between 1:00 and
6:00 p.m., to reduce crowding. The service will be improved from every 6 min
to every 5 min 30 s.
Service
reduction
36
Finch West 
Service
increase
-
Service
will be increased during the morning peak period from Monday to Friday, to
reduce crowding. The combined service east of Jane Street will be improved
from every 2 min 55 s to every 2 min 40 s.
-
Service
will be increased during the daytime on Saturdays, to reduce crowding. The
combined service east of Kipling Avenue will be improved from every 7 min 40
s to every 6 min 30 s. Service west of Kipling Avenue will be changed from
every 7 min 40 s to every 13 min.
509
Harbourfront
Seasonal
service change
-
Service
will return to the spring/fall levels, to match seasonal ridership changes
along Harbourfront. Late evening service, seven days a week, will be
eliminated for the fall and winter. Service west of Fleet Loop to Exhibition
will start at approximately 9:00 a.m. from Monday to Saturday, instead of
the earlier start time in the summer.
-
Service
will be operated every 10 to 13 min in the peak periods, every 10 min during
the daytime on weekends and holidays, and every 20 min during the midday
from Monday to Friday and during the early evening from Monday to Saturday.
|
Approximate
first and last trip times |
Mon-Fri |
Sat/hol |
Sunday |
|
Union Stn, first
departure to Fleet only |
6:00 a.m. |
6:10 a.m. |
- |
|
Union Stn, first
departure to Exhibition |
9:01 a.m. |
9:00 a.m. |
9:00 a.m. |
|
Union Stn, last
departure to Exhibition |
10:00 p.m. |
10:00 p.m. |
10:00 p.m. |
|
Union Stn, last
departure to Fleet only |
10:40 p.m. |
10:40 p.m. |
10:40 p.m. |
|
Fleet Loop, first
departure to Union |
5:50 a.m. |
6:00 a.m. |
8:48 a.m. |
|
Exhibition, first
departure to Union |
9:16 a.m. |
9:16 a.m. |
9:16 a.m. |
|
Exhibition, last
departure to Union |
10:25 p.m. |
10:25 p.m. |
10:25 p.m. |
38
Highland Creek 
Trip
time change
Service
reduction
-
Service
will be reduced in the morning and afternoon peak periods, and during the
daytime on Saturdays, to allow service to be increased on other routes to
reduce crowding. The service will change from every 11 min to every 13 min
in the morning, from every 12 min to every 14 min in the afternoon, and from
every 12 min to every 15 min in the daytime on Saturdays.
139 Huntingwood
Service
reduction
35
Jane
Service
increase
40 Junction
Service
increase
43
Kennedy 
Service
increase
504
King and 303
Don Mills
Track
reconstruction ends
-
The
track reconstruction on Broadview Avenue between Dundas Street and Queen
Street will be completed at the end of the Labour Day weekend, and 504 King
streetcars and 303 Don Mills buses will return to their regular routes by
Tuesday, September 4, 2001.
54 Lawrence
East
Trip
time change
-
The
first trip leaving Starspray Loop in the mornings from Monday to Friday will
be changed to depart five minutes earlier, at 5:15 a.m., to better connect
with the first southbound Scarborough RT train from Lawrence East Station.
Service
reduction
52
Lawrence West, 58 Malton ,
59 Maple Leaf ,
109 Ranee and 400 Lawrence Manor
Community Bus
Lawrence
West Station bus terminal rebuilding ends
-
The
project to rebuild the bus roadway at Lawrence West Station will be complete
in August, and all service will return to the usual routings and service
levels by Labour Day, Monday, September 3, 2001.
51
Leslie 
Service
increase
46
Martin Grove

Service
increase
129
McCowan North
Service
increase
-
Service
will be increased during the late evening from Monday to Friday, between
9:43 and 10:43 p.m., to reduce crowding. The combined service south of
Steeles Avenue will be improved from every 20 min to every 10 min. There
will be no change to departure times on the 129A (Scarborough Centre-16th
Ave) branch.
-
Service
will be increased during the early evening on Saturday, to reduce crowding.
One additional northbound trip will be added, departing Scarborough Centre
between 6:30 and 7:00 p.m. There will be no change to departure times on the
129A (Scarborough Centre-16th Ave) branch.
116 Morningside
Service
increase
-
Service
will be increased during the morning peak period from Monday to Friday, to
reduce crowding. The service on the 116 (Kennedy Stn-Old Finch) branch will
be improved from every 8 min to every 7 min 20 s.
-
Service
will be increased during the midday from Monday to Friday, to reduce
crowding. The service on each of the 116 Morningside and 86
Scarborough
routes will be improved from every 12 min to every 10 min 30 s.
-
Service
will be increased during the afternoon peak period from Monday to Friday, to
reduce crowding. The service on the 116 (Kennedy Stn-Old Finch) branch will
be improved from every 6 min 15 s to every 5 min 30 s.
133 Neilson
Service
increase
73
Royal York 
Schedule
change
-
Service
will be changed on the 73B (Royal York Stn-Eglinton and La Rose Ave) branch
during the afternoon peak period from Monday to Friday, to improve
reliability. Additional time will be added to the schedule, to reduce the
effects of traffic congestion. Buses will run every 30 min during the
morning and afternoon peak periods.
Service
reduction
76
Royal York South and 15 Evans
Temporary
schedule change - City construction
-
The
City of Toronto is rebuilding the Royal York Road bridge over Mimico Creek
(south of Bloor Street). The project started on June 4, 2001, and will last
until the fall. The road has remained open, but is restricted to one lane,
with traffic signals.
-
All
trips on the 15 Evans and 76
Royal York South routes will continue to
operate over the present route. Additional time will be added to the
schedules of both routes, to reduce the effects of traffic delays. On the 76
Royal York South route, the combined service north of The Queensway will
change from every 4 min 44 s to every 5 min 18 s. In the afternoon, the
combined service north of The Queensway will change from every 5 min 36 s to
every 6 min 14 s. There will be no change to service levels on the 15 Evans
route, but some trip times will change.
86 Scarborough
Seasonal
service change
-
The
hours of service to the Toronto Zoo will be changed to match the earlier
closing time of the zoo, at 6:00 p.m. The last trips on the 86A Scarborough
(Kennedy Stn-Toronto Zoo) branch will leave the zoo at approximately 7:00
p.m. from Monday to Friday. Weekend and holiday service to the zoo on the 86
Scarborough route will be discontinued after Labour Day for the fall and
winter.
Service
increase
-
Service
will be increased during the midday from Monday to Friday, to reduce
crowding. The service on each of the 116 Morningside and 86 Scarborough
routes will be improved from every 12 min to every 10 min 30 s.
-
Service
will be increased during the afternoon peak period from Monday to Friday, to
reduce crowding. The service on the 86A (Kennedy Stn-Toronto Zoo) branch
will be improved from every 16 min to every 13 min 20 s. The service on the
86E (Kennedy Stn-Sheppard Express) branch will be improved from every 13 min
to every 11 min.
79
Scarlett Rd 
Service
increase
85
Sheppard East 
Seasonal
service change
-
The
hours of service to the Toronto Zoo will be changed to match the earlier
closing time of the zoo, at 6:00 p.m. The last trips on the 85B Sheppard
East (Sheppard Stn-Toronto Zoo) and 85D Sheppard East (Sheppard Stn-Rouge
Hill GO Stn via Toronto Zoo) branches will leave the zoo at approximately
7:00 p.m. on Saturdays, Sundays, and holidays.
Service
increase
-
Service
will be increased between 1:30 and approximately 3:00 p.m. from Monday to
Friday, to reduce crowding. The combined service east of Brimley Road will
be improved from every 7 min 20 s to every 5 min.
-
Service
will be increased early on Saturday mornings, to reduce crowding. The
combined service west of Meadowvale Road will be improved from every 15 min
to every 10 min between 7:00 and 8:30 a.m.
-
Service
will be increased in the afternoon on Saturdays, to reduce overcrowding.
Between 12:00 noon and 7:30 p.m. the combined service west of Meadowvale
Road will be improved from every 6 min 15 s to every 5 min 30 s.
-
Service
will be increased on Sundays and holidays, to reduce crowding. The combined
service west of Meadowvale Road will be improved from every 9 min to every 7
min before noon, and from every 7 min to every 6 min 30 s after noon.
75
Sherbourne

Service
increase
-
One
additional round trip will be operated at the end of the morning peak
period, to reduce crowding. The 11 min morning peak period service will
continue until approximately 9:50 a.m. southbound from South Drive, and
10:13 a.m. northbound from Queens Quay.
Service
reliability improvement
512
St Clair 
Track
reconstruction ends
-
The
project to rebuild the track at four car stops on St. Clair Avenue and on
Bathurst Street will conclude by Sunday, September 2, 2001, and normal
streetcar operation will resume.
Service
increase
Service
reliability improvement
-
Additional
time will be added to the schedules during the afternoon peak period, and
the daytime on Saturdays, Sundays, and holidays, to improve service
reliability. The service will change from every 3 min 40 s to every 3 min 45
s in the afternoon peak period. There will be no change to service levels
during the daytime on Saturdays, Sundays, or holidays.
Service
reduction
53
Steeles East 
Service
increase
-
Service
will be increased between 1:30 and 2:40 p.m. from Monday to Friday, to
reduce crowding. The service will be improved from every 10 min to every 9
min.
-
Service
will be increased during the afternoon peak period from Monday to Friday, to
reduce crowding. The combined local service west of Pharmacy Avenue will be
improved from every 6 min to every 5 min 30s. The service on the 53E (Finch
Stn-Markham Rd) express branch will be improved from every 8 min to every 7
min 30 s.
-
Service
will be increased between 6:45 and 8:30 p.m. from Monday to Friday, to reduce
crowding. The service will be improved from every 10 min to every 6 min 45
s. Two additional express trips will be operated at the end of the afternoon
peak period, to reduce crowding. The trips will depart eastbound from Finch
Station at approximately 6:55 and 7:05 p.m.
-
On
Saturdays, two additional trips will be operated, departing eastbound from
Finch Station at approximately 7:10 and 7:30 p.m. On Sundays and holidays,
the 12 min early evening service will continue until 7:40 p.m., eastbound
from Finch Station.
60
Steeles West 
Service
increase
168 Symington
Service
increase
10 Van
Horne
Service
reduction
24 Victoria
Park
Service
increase
-
Service
will be increased during the afternoon on Sundays and holidays, to reduce
crowding. The service will be improved from every 12 min to every 10 min 30
s.
-
Service
will be increased between approximately 6:36 to 7:36 p.m. on Sundays and
holidays, to reduce crowding. The service will be improved from every 20 min
to every 12 min.
68 Warden
Service
increase
-
Service
will be increased during the morning peak period from Monday to Friday, to
reduce crowding. The combined service south of Steeles Avenue will be
improved from every 5 min to every 4 min 45 s.
-
Service
will be increased at the beginning of the afternoon peak period from Monday
to Friday, to reduce crowding. The service will be improved from every 10
min to every 6 min 30 s, southbound from Steeles Avenue from approximately
2:05 to 2:30 p.m.
-
Service
will be increased during the afternoon on Saturdays, to reduce crowding. The
combined service south of Steeles Avenue will be improved from every 12 min
30 s to every 11 min.
-
Service
will be increased during the afternoon on Sundays and holidays, to reduce
crowding. The service will be improved from every 14 min to every 12 min.
94
Wellesley 
Service
reliability improvement
112 West
Mall
Trip
time changes
-
Two
trips will be revised in the morning peak period to better accommodate
customers who are travelling to Michael Power/St. Joseph Secondary School.
These northbound trips will arrive at the school at 8:10 and 8:16 a.m.
-
Three
trips will be revised at the beginning of the afternoon peak period to
better accommodate customers who are travelling from Michael Power/St.
Joseph Secondary School. These southbound trips will leave the school at
2:40, 2:45 and 2:50 p.m.
89
Weston 
Service
increase
-
Service
will be increased during the daytime on Sundays and holidays, to reduce
crowding. The service will be improved from every 12 min to every 10 min 30
s between 11:00 a.m. to 5:00 p.m., and from every 15 min to every 12 min
between 5:00 p.m. to 7:40 p.m.
165 Weston
Rd North
Service
increase
-
Service
will be increased during the afternoon peak period from Monday to Friday, to
reduce crowding. The combined service south of Steeles Avenue will be
improved from every 10 min to every 9 min. Service in York Region on the
165D (York Mills Stn-Rutherford) branch will be improved from every 20 min
to every 18 min.
96
Wilson
and 165 Weston Rd North
Service
increase
-
Service
will be increased during the afternoon on Sundays and holidays, to reduce
crowding. The service on each route will be improved from every 24 min to
every 20 min, and the combined service on Wilson Avenue will be improved
from every 12 min to every 10 min. Service in York Region on the 165D (York
Mills Stn-Rutherford) branch will be improved from every 48 min to every 40
min.
92 Woodbine
South
Service
increase
95 York
Mills
Service increase
-
Service
will be increased between 10:00 and 11:00 a.m. from Monday to Friday, to
reduce crowding. The combined service west of Military Trail will be
improved from every 10 min to every 7 min 30 s.
-
Service
will be increased during the afternoon on Saturdays, to reduce crowding. The
service will be improved from every 12 min to every 11 min.
196 York
University Rocket
Service
increase
-
Service
will be increased during the peak periods from Monday to Friday, to reduce
crowding. The combined service between Downsview Station and York University
will be improved from every 3 min 20 s to every 3 min in the morning, and
from every 6 min to every 5 min in the afternoon. Service between Sheppard
Station and Downsview Station will be improved from every 10 min to every 9
min in the morning, and from every 12 min to every 10 min in the afternoon.
Seasonal
route changes
Summer
service changes end
-
The
seasonal route changes and seasonal increases in the hours of service that
began on some routes in May and June 2001 will end on Labour Day, Monday,
September 3, 2001.
Summer services ending after Monday, September 4:
6
Bay - Saturday, Sunday, and holiday evening service will end
29 Dufferin - Route
extension into Exhibition grounds to serve Ontario Place will end
509 Harbourfront - Late
evening service will end
107 Keele North - Service
will return to York University
30 Lambton - Saturday,
Sunday, and holiday route extension into High Park will end
86 Scarborough -
Monday-Friday extended evening hours of service to Toronto Zoo will end
86 Scarborough - Saturday,
Sunday, and holiday route extension to Toronto Zoo will end
85 Sheppard East -
Saturday, Sunday, and holiday extended evening hours of service to Toronto Zoo
will end
HOLIDAY SERVICE
Details
for service on the Labour Day holiday weekend are:
Saturday,
September 1, 2001 - A regular Saturday service will be operated.
Sunday, September 2, 2001 - A regular Sunday service will be
operated. Routes which had increased seasonal service or seasonal route
extensions in August will continue to operate their summer service on this day.
Labour Day, Monday, September 3, 2001 - A regular holiday service
will be scheduled on Labour Day, Monday, September 3, 2001. This means that
routes which operate on Sundays in August will operate at the same levels of
service as on Sundays, but service will start earlier in the morning, at about
the same time as on Saturdays. Summer service increases, summer route
extensions, and summer extensions of hours of service will all be in effect on
Labour Day.
Details for service on the Thanksgiving holiday weekend are:
Saturday, October 6, 2001 - A regular Saturday service will be operated.
Sunday, October 7, 2001 - A regular Sunday service will be operated.
Thanksgiving holiday, Monday, October 8, 2001 - A regular holiday service will
be scheduled on Thanksgiving, Monday, October 8, 2001. This means that routes
which operate on Sundays in September and October will operate at the same
levels of service as on Sundays, but service will start earlier in the morning,
at about the same time as on Saturdays.
|